What Are the Fees on a Bridging Loan? A Full Breakdown
Introduction
The interest rate on a bridging loan is only one part of the cost. In practice, the fees can determine whether a quote is competitive or simply looks attractive at first glance.
This is where many property buyers and investors go wrong. They compare one lender offering 0.74% per month with another quoting 0.82%, but overlook the arrangement fee, exit fee, valuation, legal bills or broker charges. The loan with the lower headline rate can end up costing more overall.
Bridging finance is designed to provide short-term funding when a conventional mortgage is unsuitable, too slow or unavailable for the transaction. It can be useful for auction purchases, property refurbishment, chain breaks and time-sensitive investment opportunities. However, because the finance is short-term and often secured against property, understanding the full cost before committing is essential.
According to Bridging Trends' Q2 2026 figures, the average monthly bridging interest rate was 0.81%, compared with 0.82% in Q1. This is an average across reported completed transactions, not a rate that every borrower should expect to receive.
The important question is not simply, “What is the monthly interest rate?” It is:
How much will this facility cost me from completion to redemption, including every fee and the possibility that my exit takes longer than expected?
This guide breaks down the main bridging loan fees, explains when they are charged and works through an illustrative £300,000 loan so you can compare offers more confidently.
Key takeaways
- Interest is only one component: arrangement fees, valuation, legal work, broker charges and exit fees can materially increase the total cost.
- The lowest rate is not always the cheapest deal: compare the total pounds payable over the same borrowing period.
- Fees are structured differently: some are paid upfront, some are deducted from the advance, and others may be added to the loan.
- Your exit strategy matters: a delayed property sale or refinance can increase interest and potentially trigger extension costs.
- Budget for both sets of legal fees: the borrower generally pays their own solicitor and the lender's legal costs where applicable.
- Ask for a written breakdown: confirm the amount you will receive, the amount you must repay and the conditions attached to the quote.
Table of contents
- The main fees on a bridging loan
- Worked example: a £300,000 bridging loan at 0.79% per month
- How to compare bridging loan quotes properly
- Why some bridging loan quotes look cheaper than they are
- What determines the cost of bridging finance?
- How to reduce your total bridging loan costs
- Who should consider bridging finance, and when should you avoid it?
- Frequently asked questions
1. The main fees on a bridging loan
The total cost of a bridging loan usually comprises interest, lender fees and transaction costs. The precise combination depends on the lender, property, loan structure and circumstances of the borrower.
Here is a breakdown of the charges worth checking before you proceed.
Bridging loan fees: full breakdown table
| Fee or cost | What it covers | How it may be charged |
|---|---|---|
| Monthly interest | The cost of borrowing the money | A percentage of the outstanding loan, usually quoted per month |
| Arrangement fee | Setting up the loan facility | Often a percentage of the loan, paid upfront, deducted or added to the balance |
| Exit fee | A charge for redeeming the loan, where applicable | A fixed amount or percentage, subject to the facility terms |
| Valuation fee | Assessment of the property used as security | Usually paid when the valuation is instructed |
| Legal fees | Legal work for the borrower and lender | Separate bills or agreed legal costs, depending on the case |
| Broker fee | Advice, sourcing and arranging the finance | May be a fixed fee or percentage, where charged |
| Administration and transfer fees | Processing, drawdown, redemption or bank transfers | Fixed charges specified by the lender or provider |
| Monitoring or professional fees | Additional oversight on refurbishment or development cases | Depends on the property, works and facility |
| Extension or default charges | Costs that may apply if repayment is delayed or contractual terms are breached | Depends on the agreement and circumstances |
| Non-utilisation or commitment fee | May apply to certain facilities where funds are reserved but not drawn | Depends on the facility structure |
Not every lender charges every fee. Equally, the table is not exhaustive: unusual properties, complex ownership structures, development works or second-charge lending can create additional costs.
1.1 Monthly interest
Interest is normally the largest variable cost on a bridging loan. Rates are commonly quoted as a monthly percentage, often written as per calendar month or pcm.
For example, on a £300,000 balance at 0.79% per month:
- Monthly interest: £2,370
- Six months of simple interest: £14,220
- Twelve months of simple interest: £28,440
These figures assume the balance remains at £300,000 throughout and that interest is calculated on a simple, non-compounding basis. Actual costs can differ if interest is compounded, charged daily, calculated on a changing balance or charged on fees added to the loan.
The length of time you hold the facility therefore matters. A loan expected to last three months can become considerably more expensive if a sale, refinance or refurbishment takes nine months.
For market context, the Q2 2026 Bridging Trends data reported an average monthly rate of 0.81%. This figure describes completed transactions across the reporting panel; it is not a guaranteed offer or a benchmark that applies equally to every borrower.
1.2 Arrangement fee
An arrangement fee is charged for setting up the facility. It is frequently calculated as a percentage of the loan amount.
For illustration, a 2% arrangement fee on £300,000 is £6,000.
Check three details before comparing this fee:
- The calculation base: is the percentage applied to the gross facility, the net advance or another defined amount?
- The payment method: must you pay it upfront, is it deducted from the advance, or is it added to the loan?
- The interest treatment: if the fee is added to the balance, will interest be charged on it?
These details affect both the amount of cash you receive and the eventual redemption figure.
A £300,000 facility with a £6,000 arrangement fee deducted at completion does not put £300,000 into your bank account. Before other deductions, the net advance would be £294,000. If you need £300,000 to complete a purchase, you must account for this shortfall when structuring the loan.
1.3 Exit fee
An exit fee is charged by some lenders when the facility is repaid. It is not universal.
The fee may be expressed as a percentage of the original loan, the amount repaid or another amount defined in the agreement. The wording matters.
For example, a 1% exit fee calculated on a £300,000 original facility would be £3,000. If the facility has a different calculation basis, the actual charge may differ.
Ask the lender or broker to confirm in writing:
- Whether an exit fee applies.
- How it is calculated.
- Whether it is payable on an early redemption.
- Whether it is payable in addition to interest and other redemption charges.
A quote with a lower interest rate but a substantial exit fee may not be the most economical option.
1.4 Valuation fee
The lender needs to assess the property being used as security. Depending on the case, this could involve a standard valuation, a more detailed inspection or specialist professional input.
The cost depends on factors such as:
- Property value and type.
- Location and accessibility.
- Whether the property is residential, commercial, mixed-use or land.
- Whether refurbishment or development work is involved.
- The scope of the report required by the lender.
The valuation fee is often payable before the loan completes. Ask whether it is refundable if the transaction does not proceed, and whether the report can be reused if the application changes. Do not assume either is possible.
For auction purchases, valuation timing is particularly important. You may have a short completion deadline, but a lender still needs to be satisfied with the security and the proposed exit. A valuation delay can affect the entire transaction.
1.5 Legal fees
Legal costs can include the borrower's solicitor, the lender's solicitor and additional work required to complete the transaction.
The amount varies according to the complexity of the case. A straightforward purchase of a standard residential property is not the same as a transaction involving multiple titles, a company borrower, an existing charge, a leasehold property or complicated title issues.
Your budget should account for:
- Your own solicitor's fees and disbursements.
- The lender's legal costs where payable by you.
- Title investigation and searches.
- Registration of the lender's security.
- Additional legal work arising from complications or changes.
Ask for estimates of both sets of legal costs before proceeding. Also ask whether the estimate includes disbursements and what could cause it to increase.
Legal fees can be incurred even if the loan does not complete. A failed transaction is therefore not necessarily a cost-free transaction.
1.6 Broker fee
A broker may help identify suitable lenders, compare facility structures, prepare an application and coordinate the process.
Some brokers charge the borrower a fee; others may receive commission from the lender. Some arrangements involve both, so it is important to understand the total remuneration structure.
Before proceeding, establish:
- Whether you will pay a broker fee.
- Whether it is fixed or calculated as a percentage.
- When it becomes payable.
- Whether it is refundable if the loan does not complete.
- Whether the broker receives lender commission and how this is disclosed.
Broker fees should be assessed alongside the service and facility being arranged, not in isolation. A fee is not automatically justified by a low headline rate, and a fee-free offer is not automatically the best overall option.
1.7 Administration and transfer fees
Some facilities include administrative, drawdown, bank transfer or redemption charges.
Each may appear relatively small compared with the interest bill, but several charges can accumulate over the life of a loan. Ask for a list of all fixed fees, including any payable when the loan is repaid.
Check whether charges apply once or more than once, and whether any amount is payable if the transaction is cancelled before completion.
1.8 Monitoring surveyor and professional fees
These costs are more relevant to refurbishment and development projects than to straightforward purchases.
A lender funding a property with substantial works may require reports or ongoing monitoring to assess progress, costs and the value of the security. Depending on the facility, there may also be professional fees relating to quantity surveying or inspections.
The important point is to budget for the whole funding structure, not just the initial advance. If money is released in stages, ask what evidence is required for each release and whether inspections incur additional charges.
1.9 Extension fees and default charges
Bridging finance is intended to be short-term. If the planned exit takes longer than expected, you may need to request an extension or refinance the facility.
Possible consequences include:
- Additional interest for the extended period.
- An extension or amendment fee, if specified.
- Additional legal or valuation costs.
- A higher rate or other contractual consequences where applicable.
- Default interest or enforcement costs if the agreement's conditions are breached.
These outcomes depend on the loan agreement and the lender's decisions. An extension should never be assumed to be automatic.
The better approach is to model a realistic delay before taking out the loan. If your plan only works when everything happens on the earliest possible date, the financing may be too fragile.
2. Worked example: a £300,000 bridging loan at 0.79% per month
The following illustration shows how costs can build on a £300,000 facility. It is an educational example, not a lender quotation or an estimate of the fees available to a particular borrower.
Assumptions
- Loan amount: £300,000.
- Interest rate: 0.79% per month.
- Holding period: six months.
- Arrangement fee: 2% of the loan.
- Exit fee: none.
- Valuation, legal, broker and administration costs: illustrative allowances.
- Interest: simple interest on the original £300,000 balance, paid at redemption.
- No extension, default or additional monitoring charges.
Illustrative cost breakdown
| Cost item | Calculation or assumption | Amount |
|---|---|---|
| Interest | £300,000 × 0.79% × 6 months | £14,220 |
| Arrangement fee | £300,000 × 2% | £6,000 |
| Valuation | Illustrative allowance | £900 |
| Legal fees | Illustrative allowance for both sides | £2,500 |
| Broker fee | Illustrative allowance | £1,500 |
| Administration and transfers | Illustrative allowance | £150 |
| Exit fee | Assumed not applicable | £0 |
| Total estimated borrowing costs | All listed costs | £25,270 |
Under these assumptions, the cost of borrowing is £25,270, excluding repayment of the original £300,000 principal. The total of principal plus the listed borrowing costs would be £325,270 if all the assumed costs were paid separately and no additional interest or charges arose.
The actual cash required at completion and the final redemption amount will depend on how the lender treats fees and interest. If the arrangement fee or other costs are deducted from the advance, the amount received will be lower. If a fee is added to the loan, the agreement may charge interest on it.
What if the loan runs for longer?
The same £300,000 facility at 0.79% per month generates £2,370 of simple interest for each additional month on a constant balance.
| Holding period | Illustrative interest | Total costs using the same £11,050 in non-interest costs |
|---|---|---|
| 3 months | £7,110 | £18,160 |
| 6 months | £14,220 | £25,270 |
| 9 months | £21,330 | £32,380 |
| 12 months | £28,440 | £39,490 |
These are not predictions of the eventual cost. They assume the same rate, constant principal, simple interest and unchanged non-interest fees throughout. A lender may charge differently, and extensions may involve additional costs.
The lesson is straightforward: the expected repayment date is a major part of the cost calculation. A facility that looks manageable over six months may be substantially more expensive if the exit takes a year.
Why the net advance matters
Suppose you need £300,000 to complete a property purchase. If a lender deducts the illustrative £6,000 arrangement fee from a £300,000 gross facility, the cash advance would fall to £294,000 before any other deductions.
That shortfall could prevent you from completing unless you have additional funds or structure the borrowing differently.
When comparing offers, ask for both:
- Gross facility: the amount of finance being arranged.
- Net funds available: the cash you will actually have available after applicable deductions.
Then ask for a redemption illustration showing the amount due if you repay after your expected holding period, plus a reasonable delay.
3. How to compare bridging loan quotes properly
The most reliable way to compare bridging offers is to put them on the same basis.
A headline rate alone does not tell you how much the loan will cost, when you must pay the charges or how much cash will be available to complete the transaction.
Step 1: Compare the same loan amount
Make sure each offer is based on the same gross facility and the same amount of cash required for the purchase or project.
A lower-rate offer may provide less usable cash because fees are deducted upfront or because interest is retained from the advance. Compare the actual net proceeds, not just the figure printed at the top of the quote.
Step 2: Use the same holding period
Compare both offers over the same realistic term. If you expect to repay in six months, calculate the cost at six months, but also test a nine-month scenario.
Do not assume that a shorter contractual term means the loan will necessarily be cheaper. The important issue is the total cost under the circumstances that are reasonably likely to occur.
Step 3: Include every fee
Create a list of:
- Interest.
- Arrangement fee.
- Exit or redemption fee.
- Valuation.
- Borrower's legal fees.
- Lender's legal fees.
- Broker fee.
- Administration and transfer charges.
- Monitoring or professional fees, where applicable.
- Potential extension costs.
Record whether each fee is payable upfront, deducted from the advance, added to the balance or paid on redemption.
Step 4: Check how interest is calculated
Ask whether interest is serviced monthly, retained upfront, rolled up or compounded, and how the lender calculates partial months.
These structures can have different cash-flow consequences:
- Serviced interest: you pay interest during the loan term, usually monthly.
- Retained interest: an agreed amount is withheld from the advance to cover a specified interest period.
- Rolled-up interest: interest accrues and is paid when the loan is redeemed, subject to the contract.
- Compounded interest: unpaid interest is added to the balance on which further interest is calculated, where the agreement provides for this.
The terms can overlap in how lenders describe their products, so use the facility documents rather than relying on a label alone.
Step 5: Ask for redemption figures
Request a written illustration of the amount needed to repay the facility at different points, such as months three, six and nine.
This helps reveal the effect of the holding period, fees and any minimum-interest provisions or other terms.
Confirm whether an early repayment reduces the interest charged or whether a minimum interest period applies. Do not assume that repaying early automatically means you only pay for the exact days you borrowed.
Step 6: Test the exit strategy
The exit is the plan for repaying the bridge, usually through a sale, refinance or another confirmed source of funds.
Ask what happens if the property sells below the expected price, the refinance valuation is lower than planned or the works overrun. A quote should be assessed alongside the feasibility of the exit, not just the rate.
Step 7: Compare certainty and conditions, not just price
Two offers may differ in valuation requirements, legal complexity, drawdown conditions and the time needed to reach completion.
For an auction purchase, the timing may be especially important because the buyer becomes contractually committed at the fall of the hammer and must follow the auction contract's completion deadline.
The cheapest offer on paper may not be the most suitable if its conditions cannot be met in time. Equally, do not assume a higher-priced lender will complete faster: check the actual requirements and process for your case.
Bridging loan quote comparison checklist
Before accepting an offer, make sure you can answer these questions:
What is the gross facility and how much cash will I receive?
What monthly rate applies to my case?
How is interest calculated, and when is it payable?
What is the arrangement fee and how is it charged?
Is there an exit fee or minimum interest period?
What are the estimated valuation and legal costs?
Will I pay a broker fee, and when?
Are there administration, monitoring or other charges?
What will I owe if I repay on the planned date?
What happens if I need another three to six months?
Is my proposed exit realistic and supported by evidence?
Are the lender's conditions achievable within my deadline?
4. Why some bridging loan quotes look cheaper than they are
A quote can appear competitive because its headline interest rate is low. But the full structure may include fees or conditions that change the final cost.
Consider two hypothetical six-month offers for a £300,000 facility.
| Cost item | Offer A | Offer B |
|---|---|---|
| Monthly rate | 0.75% | 0.82% |
| Six months' simple interest | £13,500 | £14,760 |
| Arrangement fee | 2% (£6,000) | 1% (£3,000) |
| Exit fee | 1% (£3,000) | £0 |
| Interest and listed lender fees | £22,500 | £17,760 |
In this illustration, Offer A has the lower monthly rate, but Offer B has £4,740 less in interest and the listed lender fees combined.
The comparison excludes valuation, legal, broker and other costs. It also assumes the same £300,000 balance for six months, simple interest and the stated fee calculations. Actual offers may calculate charges differently.
This is why comparing rates without the rest of the fee structure can be misleading.
The quote may assume an unrealistic exit date
If the price assumes repayment after three months but your refurbishment, sale or refinance is more likely to take nine months, the quote does not reflect your likely cost.
Build a realistic schedule and test a delay before deciding.
The fee may be based on a different amount
One lender might calculate its arrangement fee on the gross facility; another may use a different basis. If one fee is deducted from the advance and another is added to the balance, the cash-flow and interest consequences may differ.
Ask for a written breakdown of the fee calculation.
Some charges only become clear later
Legal work can become more expensive if title issues emerge. A lender may request further valuation work or professional reports. A project that changes after the initial quote can also require revised terms.
These charges are not necessarily hidden fees; they may arise from the circumstances of the case. The practical response is to ask what the quote excludes and which events could increase the cost.
Speed has a cost, but delay has one too
A bridging loan may make a transaction possible when a conventional mortgage cannot meet the timetable. That benefit needs to be weighed against the cost of the facility and the risks of a delayed exit.
Broker experience can help borrowers compare the structure, conditions and total cost of different options. It cannot guarantee lender approval or remove the risks inherent in the transaction.
Auction360's bridging finance service can help you explore the funding structure. If the finance is for an auction purchase, you can also review auction finance, auction risk analysis and auction day funding.
5. What determines the cost of bridging finance?
There is no single rate or fee structure that applies to every bridging loan. The lender assesses the property, borrower, amount requested and repayment plan.
Loan-to-value ratio
Loan-to-value, or LTV, compares the amount borrowed with the relevant property value used by the lender.
A lower LTV can reduce the lender's exposure if the borrower cannot repay. Higher borrowing relative to the property's value can increase risk and affect pricing or the maximum advance available.
Do not assume the lender will use the purchase price as the valuation for lending purposes. The lender's valuation and criteria determine the basis of its calculation.
Property type and condition
A standard residential property may be assessed differently from a commercial unit, mixed-use building, development site or property requiring major refurbishment.
Unusual construction, title complications, limited marketability or extensive works can affect both the lender's appetite and the professional costs required.
First charge or second charge
A first-charge lender generally has priority over the secured property. A second-charge lender ranks behind the existing first-charge lender, subject to the legal arrangements.
Second-charge lending can be useful where an existing mortgage is to remain in place, but it introduces additional considerations about security priority, consent, repayment and affordability. Pricing and fees may differ accordingly.
The strength of the exit strategy
A clearly evidenced exit is important. A planned property sale, a refinance supported by a credible route to eligibility or another documented repayment source may be assessed differently from a plan that depends on uncertain future events.
If your exit relies on completing refurbishment and achieving a higher valuation, allow for the possibility that the work takes longer or the valuation is lower than expected.
Loan term and repayment structure
The longer a facility remains outstanding, the more interest it may accrue. The effect depends on the rate, balance and method of calculation.
A retained-interest facility can also reduce the cash available on day one because interest is reserved upfront. A rolled-up facility may preserve initial cash flow but leave a larger amount to repay at exit. Neither structure is automatically cheaper; compare the actual figures.
Borrower circumstances and transaction complexity
Lenders may consider experience, credit history, ownership structure, source of funds and the nature of the transaction. The weight given to each factor varies by lender and product.
Disclose material information accurately at the outset. An application that needs to be reworked after underwriting can cause delays and may affect the terms available.
6. How to reduce your total bridging loan costs
The aim should not be to secure the lowest headline rate at any cost. It should be to arrange a facility that meets the transaction's needs, provides sufficient net funds and can realistically be repaid on time.
1. Borrow only what the transaction requires
Avoid taking a larger facility than necessary unless there is a clear reason to do so. Depending on how the lender calculates fees and interest, a larger loan can increase both.
At the same time, do not underestimate the funds required for completion, taxes, professional fees, refurbishment and contingencies. An underfunded project can become more expensive if it causes delays.
2. Get the documents ready early
Prepare the relevant property details, legal information, identification, source-of-funds evidence and exit documentation as early as possible.
For an auction purchase, review the legal pack and special conditions before bidding. Establish whether the property, title and completion timetable are compatible with the proposed finance.
3. Get realistic valuation and legal estimates
Ask for estimates early and understand what they cover. Flag any unusual title, leasehold, company ownership or refurbishment issues before the application progresses.
The objective is to reduce avoidable surprises, not to assume professional costs can be eliminated.
4. Negotiate the overall structure
Where appropriate, ask whether the arrangement fee, exit fee or other charges can be improved. The scope for negotiation depends on the lender, case strength and product.
Compare any revised offer against the total cost, not just the fee that changed.
5. Build a contingency into the exit plan
If your repayment depends on a sale, consider the time needed to market, agree a sale and complete it. If you intend to refinance, establish the likely eligibility requirements and allow for valuation, underwriting and legal work.
A contingency period may increase the interest budget, but it can expose a deal that only works under optimistic assumptions.
6. Avoid relying on an extension
An extension may be available, but it is not guaranteed. It can involve additional interest, fees or conditions.
Before drawing down the loan, ask what the agreement says about extensions and model a delayed exit. If the deal becomes unviable after a short delay, reconsider the structure before committing.
7. Compare the right products
Bridging finance is not always the best option. Depending on the property and purpose, a conventional mortgage, refurbishment facility or development finance may be more suitable.
The correct comparison should account for eligibility, timing, fees, the planned term and the repayment strategy. A cheaper long-term product is not helpful if it cannot be arranged in time, while a quick bridge can become expensive if the exit is uncertain.
7. Who should consider bridging finance, and when should you avoid it?
Bridging finance may be appropriate when there is a clear short-term funding need and a credible plan for repayment.
It may suit borrowers who:
- Need to complete an auction purchase within a fixed deadline.
- Are buying a property that is not currently suitable for a standard mortgage.
- Need short-term funds while selling another property.
- Are funding refurbishment before a planned sale or refinance.
- Have a defined funding gap with a credible, documented exit.
It may be unsuitable when:
- There is no credible repayment strategy.
- The deal only works if the property value rises substantially.
- The expected sale or refinance date is overly optimistic.
- The borrower cannot afford the likely interest and fees.
- The property or title is unlikely to meet the lender's requirements.
- A suitable longer-term funding option is available and the timing allows it.
The central question is whether the transaction still makes sense after every fee, a realistic holding period and a reasonable delay have been accounted for.
For auction purchases, consider reading Auction Demystified by Deji Nehan for practical guidance on understanding auction transactions and preparing before you bid.
8. Frequently asked questions about bridging loan fees
What is the most important fee on a bridging loan?
There is no single answer for every transaction. Interest is often the largest cost over time, but arrangement fees, exit fees and legal costs can materially change the overall price. The correct approach is to compare the total cost over your expected holding period, including the amount you will actually receive and the amount due on redemption.
Are broker fees always charged?
No. Broker fee arrangements vary. Some brokers charge the borrower, some receive lender commission and some arrangements involve both. Ask for a clear explanation of any fee you must pay, when it becomes payable and whether it is refundable if the loan does not complete.
Is rolled-up interest cheaper?
Not necessarily. Rolled-up interest can help cash flow because you do not make regular interest payments during the term, but the interest still accrues and must be repaid. Whether it is cheaper than serviced interest depends on the rate, calculation method, fees and loan terms. Compare the redemption figures for each structure.
Do all bridging lenders charge an exit fee?
No. Some facilities have an exit fee and others do not. Where one applies, check how it is calculated and whether it is payable on early redemption. An offer without an exit fee may still have higher costs elsewhere, so compare the whole facility.
Can I pay bridging loan fees upfront?
Some costs, such as a valuation fee, may be payable before completion. Arrangement fees may be paid upfront, deducted from the advance or added to the loan, depending on the lender and agreement. Legal and broker fees have their own payment terms. Ask for a payment schedule before proceeding.
Can I repay a bridging loan early to save interest?
Potentially, but it depends on the facility terms. Ask whether interest is calculated daily or monthly, whether a minimum interest period applies and whether any exit or redemption fee is payable. Do not assume early repayment automatically removes all interest for the unused period.
What happens if I cannot repay the bridge on time?
The consequences depend on the loan agreement and the lender's response. Interest may continue to accrue, and extension, default or enforcement costs may apply in relevant circumstances. The lender may not agree to an extension. Because the loan is secured against property, failure to repay can ultimately put the security at risk.
If a delay becomes likely, seek advice promptly and speak to the lender or broker before the contractual repayment date rather than waiting until the loan is overdue.
Are bridging loan fees tax-deductible?
Tax treatment depends on the purpose of the borrowing, the ownership structure, the nature of the expense and the borrower's circumstances. Do not assume that every fee or interest payment is deductible. Obtain advice from a suitably qualified UK tax adviser or accountant who understands the transaction.
How much does a £300,000 bridging loan cost?
There is no universal figure. It depends on the monthly rate, term, fee structure, valuation and legal costs, broker charges and exit fee, if any. In the illustrative six-month example above, the listed costs total £25,270 under the stated assumptions. This is not a market quote and actual costs may be materially different.
Final thoughts: compare the whole facility, not just the rate
Bridging finance can help property buyers and investors move quickly when conventional funding cannot meet the transaction's requirements. But the headline rate is only one part of the decision.
Before proceeding, establish the net amount available, calculate the interest over a realistic term, include every applicable fee and stress-test the exit strategy. Make sure you understand what happens if the sale, refinance or refurbishment takes longer than planned.
The most useful quote is not necessarily the one with the lowest advertised rate. It is the one whose costs, conditions and repayment requirements fit the transaction you are actually undertaking.
If you are considering a bridge for an auction purchase, refurbishment or another property transaction, explore Auction360's bridging finance service or auction finance options. You can also review auction risk analysis before committing to a purchase.
Book a funding consultation to discuss your transaction, likely funding requirements and the questions to resolve before you commit to a facility.
About the author
Deji Nehan is a property finance professional, wealth coach and author of Auction Demystified. His work focuses on helping buyers and investors understand property finance, assess transaction risks and make better-informed funding decisions.
Important information
This article is for general educational purposes only and does not constitute financial, legal, tax or investment advice. Bridging finance is secured lending and may not be suitable for every borrower. Rates, fees, eligibility criteria and lender requirements vary and can change. Figures used in worked examples are illustrative only and are not offers or quotations. Obtain a personalised illustration and independent professional advice where appropriate before entering into a finance agreement. Failure to repay secured borrowing may result in the property used as security being repossessed.